Residential villa at Bausher

  • – starting date 25th of July 2012
  • – The estimate time to complete the works 8 months
  • – Total builtup area 320 SQM


Residential complex villas at Bausher – AlKhuwair

  • – Three private villas
  • – Total builtup area 1228 SQM
  • – Design by Al Nawa Engineering Consultancy
  • – The estimate time to complete the works 14 months


Residential multistory building at Busher – AlKuwier

  • – Basement floor +Ground floor + Four typical floor
  • – Design by Al Nawa Engineering Consultancy
  • – Total builtup area 3000 SQM
  • – The estimate time to complete the works 18 months