Residential villa at Bausher
- – starting date 25th of July 2012
- – The estimate time to complete the works 8 months
- – Total builtup area 320 SQM
Residential complex villas at Bausher – AlKhuwair
- – Three private villas
- – Total builtup area 1228 SQM
- – Design by Al Nawa Engineering Consultancy
- – The estimate time to complete the works 14 months
Residential multistory building at Busher – AlKuwier
- – Basement floor +Ground floor + Four typical floor
- – Design by Al Nawa Engineering Consultancy
- – Total builtup area 3000 SQM
- – The estimate time to complete the works 18 months